Submit your work, meet writers and drop the ads. Become a member
Jan 2020
After that, the floor had to be
dried for several days
using a hairdryer,
iron
and wiping,
keeping the window permanently open.
During this time the purchased roll
of new floorcovering
managed to reach room temperature.
New planks were quickly installed
instead of the stripped ones,
and then the entire floor was lined
with 6 mm plywood to avoid leveling.
A new monotone polyvinyl layer
was placed on the adhesive
and double-sided tape
(for fixation).
The seams were joined by silicone
sealant. After that,
the repair was completed,
as it is common to lay the lino
at the end.
Written by
Ptax Kuro
  183
     gracie, Julia and Ptax Kuro
Please log in to view and add comments on poems